Showing posts with label install. Show all posts
Showing posts with label install. Show all posts

Saturday, May 17, 2014

How to Install a Timing Belt for a 2000 Ford Focus

The Ford Focus is a compact car that Ford began manufacturing for the 2000 model year in North America. The engine for a Ford Focus made before 2005 is a four-cylinder 2.0-liter engine with a double overhead camshaft. This type of engine uses a timing belt instead of a timing chain, and requires you to replace the timing belt at regular intervals. The timing belt for a 2000 Ford Focus allows the crankshaft to turn the camshaft.

Instructions

    1

    Remove the cable from the negative battery terminal with a socket wrench to prevent you from inadvertently starting the engine. Disconnect the accessory drive belt and its tensioner. Remove the cover for the timing belt.

    2

    Loosen the lug nuts for the right front wheel with a lug wrench. Raise the vehicle and support it on jack stands. Remove the right front wheel and the right splash shield with a socket wrench. Disconnect the pulley for the crankshaft.

    3

    Turn the timing belt clockwise so that the timing marks on the camshaft and crankshaft sprockets align with their respective marks on the engine.

    4

    Loosen the bolt for the timing belt tensioner with a socket wrench. Turn the tensioner 1/4 turn counterclockwise with an 8mm Allen wrench. Place a 1/8 in. drill bit into the hole of the timing belt tensioner to hold the tensioner in place. Remove the timing belt from the camshaft sprocket and crankshaft sprocket.

    5

    Place the new timing belt on the crankshaft. Complete the timing belt installation by proceeding in a counterclockwise direction. Remove the drill bit from the timing belt tensioner hole to release the tensioner.

    6

    Turn the crankshaft clockwise by two complete turns to align the timing marks once again. Tighten the bolt for the timing belt tensioner to between 15 and 22 pounds with a torque wrench.

    7

    Connect the crankshaft pulley and tighten its mounting bolt to between 81 and 96 ft. lbs. with a torque wrench. Connect the right splash shield and right front wheel with a socket wrench.

    8

    Lower the vehicle and tighten the lug nuts with a lug wrench. Install the accessory drive belt and its tensioner with a socket wrench. Attach the cable to the negative battery terminal.

Read More.. >

How do I Install Tie Rod Ends on a 96 Honda Accord

How do I Install Tie Rod Ends on a 96 Honda Accord?

Your 1996 Honda Accords tie-rod ends are the steering components that attach the steering linkage and linkage parts to the steering knuckles with a hardened steel ball stud. A tie-rod end can be replaced alone, but many automotive parts manufacturers recommend replacing the entire tie-rod as a whole and often sell these components fully assembled. You may want to purchase just the tie-rod ends, if available, if you are looking to conduct this repair method. This procedure does not require special tools and can be done at home with little automotive experience or knowledge.

Instructions

Removing the Tie-Rod Ends

    1

    Unscrew the lug nuts on your Accord slightly, then raise your Accord and support it with jack stands.

    2

    Remove the lug nuts and take the front wheels off.

    3

    Loosen the jam nut using one open-end box wrench while holding onto the tie-rod end with another. When the thread is exposed, mark it with some correction fluid to erence the new tie-rods position.

    4

    Take out the cotter pin on the tie-rod end stud and loosen the nut, but dont remove it.

    5

    Pry the tie-rod end from the steering knuckle arm using a two-jaw puller. Now remove the nut and separate the tie-rod end from the steering knuckle arm.

    6

    Separate the tie-rod end from the tie-rod by unscrewing it.

Installing the New Tie-Rod End

    7

    Screw on the tie-rod end up to the marked point on the tie-rod; you may need your open-end wrench. Place the tie-rod stud into the steering knuckle arm.

    8

    Screw on the nut to the tie-rod end stud and torque it to 32 foot-lbs with your torque wrench. Install the new cotter pin.

    9

    Repeat all steps in each section for the other side of your Accord.

    10

    Install the wheels and screw on the lug nuts finger tight. Lower your Accord and torque the lug nuts to 80 foot-lbs.

Read More.. >

Wednesday, May 14, 2014

How do I Install 2001 883 Harley Sportster Push Rods

How do I Install 2001 883 Harley Sportster Push Rods?

Pushrods, on the exterior of the cylinders on the right side of the engine, are part of an old-fashioned connection between the cam shaft and the exhaust and intake valves on your 2001, 883 cubic centimeter, V-twin Harley engine. Pushrods are specific to 883 and 1200 Sportster engines and Big Twins, but their operation, installation and removal is identical in all 2001 Harley V-Twin engines. Adjustable pushrods can conveniently be adjusted without having to first partially disassemble the top end of the engine. The initial top end job needed to install replacement pushrods is not for novices as clearances are tight, and many tools and some skill are required.

Instructions

    1

    Close the petcock. Put the motorcycle in fifth gear.

    2

    Loosen the fender tab screw with an Allen wrench. Remove the seat.

    3

    Loosen the battery cable from the negative terminal with an open end wrench. Disconnect the cable.

    4

    Raise the motorcycle on a motorcycle jack until the rear tire clears the ground. Ensure the bike is stable.

    5

    Remove the front and rear spark plugs with a spark plug socket and a socket wrench.

    6

    Rotate the engine by rotating the rear wheel. Rotate the engine until the front piston, as viewed through the spark plug hole, is at the top of its stroke and both front lifters are at their lowest point in the compression cycle.

    7

    Remove the front rocker box cover by loosening the rocker cover bolts with a rocker cover wrench. Remove the metal D-ring. Remove the gasket and discard.

    8

    Insert a small, flat head screwdriver blade into the cast loop of the spring cap retainer at the top of the rear pushrod cover for the front cylinder.

    9

    Rotate the screwdriver bottom toward the outboard side while pushing down. Remove the spring cap cover. Repeat the procedure for the other front cylinder pushrod.

    10

    Collapse the upper and lower push rod covers.

    11

    Alternately loosen each of the four rocker arm support plate bolts in 1/4 turn increments until all four bolts are loose. Remove the rocker arm support plate assembly.

    12

    Remove the push rod covers from the cylinder head and lifter cover bores. Remove the three O-rings from the push rod covers and discard.

    13

    Remove the pushrods by hand.

    14

    Assemble the new pushrod covers. Insert the pushrod cover adapters in the cover retainers.

    15

    Insert the new pushrods in the cylinder head and lifter cover bores. Install the new cover O-rings included with the new pushrods.

    16

    Replace the rocker arm support plate into the rocker housing. Loosely install the four rocker arm support plate bolts.

    17

    Tighten the four rocker arm support plate bolts in a cross pattern by tightening each bolt 1/4 turn at a time. Final tighten the bolts to 18 to 22 foot pounds of torque with a torque wrench and a "dog bone" torque adapter.

    18

    Install a new rocker box cover gasket. Replace the D-ring.

    19

    Replace the rocker box cover. Tighten the rocker box cover bolts in a cross pattern to 20 foot pounds of torque with a torque wrench.

    20

    Extend the adjusting screws to remove lash in the pushrods.

    21

    Compress the hydraulic unit in the exhaust lifter four complete turns and tighten the lock nut.

    22

    Adjust slack in the pushrod with your fingers after waiting five minutes. Repeat all procedures for the rear cylinder.

    23

    Replace the spark plugs and tighten them with a spark plug socket and socket wrench.

    24

    Lower and remove the motorcycle jack. Shift the motorcycle into neutral.

    25

    Start the motorcycle and check for leaks.

Read More.. >

Sunday, May 11, 2014

How to Install a Jeep Power Tech 2 4L Oil Pump

Chrysler has used the PowerTech brand for a variety of unrelated engines. One type of PowerTech engine is a four-cylinder 2.4-liter engine that appeared in the Jeep Liberty from 2002 to 2005. The oil pump on this vehicle circulates oil throughout the engine to provide lubrication for its moving parts. The Jeep PowerTech 2.4-liter engine has its oil pump on the crankshaft sprocket in front of the engine.

Instructions

    1

    Remove the cable from the negative terminal of the battery with a socket wrench. Disconnect the rear cover of the timing belt and loosen the timing belt tensioner. Detach the timing belt.

    2

    Disconnect the mounting bolts for the oil pan with a socket wrench. Remove the oil pan from the engine.

    3

    Remove the crankshaft sprocket with Special Tool 6793 and Special Tool C-4685-C2. Disconnect the crankshaft key with a socket wrench and detach the oil pick-up tube from the oil pump. Remove the oil pump and the crankshaft seal from the crankshaft sprocket. Discard the crankshaft seal.

    4

    Clean the mounting surfaces for the new oil pump with a shop rag and apply gasket sealer to the mounting surfaces. Install the O-ring into the discharge passage of the oil pump. Fill the oil pump with engine oil to prime it.

    5

    Align the rotor flats of the oil pump with the crankshaft flats. Install the oil pump to the block with a new crankshaft seal. Connect the crankshaft key with a socket wrench. Install the crankshaft sprocket with Special Tool 6792 to set the sprocket to the original depth.

    6

    Connect the oil pump pick-up tube to the oil pump. Mount the oil pan and fasten the mounting bolts with a socket wrench. Install the timing belt and connect the rear cover for the timing belt with a socket wrench.

Read More.. >

Thursday, May 8, 2014

How to Install a Jagg Oil Cooler XL

How to Install a Jagg Oil Cooler XL

Since Harley-Davidson Sportster engines are air-cooled, their three quarts of oil can get very hot in the summertime, especially in desert conditions. Very hot oil is both less slippery and more easily saturated with carbon and other wastes than merely hot oil. Oil coolers increase the volume of oil circulating in the engine and improve the radiation of excess heat away from the engine. A Sportster XL requires a Jagg Slimline Oil Cooler kit. If your Sportster is a 2004 or later model you must also buy a Jagg 4400 Oil Filter Adapter.

Instructions

    1

    Ride the motorcycle for 30 miles until the oil gets as hot as possible. Park the bike and put on a pair of mechanics gloves.

    2

    Loosen the hose clamp on the oil drain line with a flat-head screwdriver. Pull the plug out of the end of the drain line with a pair of pliers drain the hot oil from the tank into a drain pan.

    3

    Re-plug, tighten and replace the oil drain line. Position the drain pan under the oil filter on the right front of the bike.

    4

    Loosen the oil filter with an oil filter wrench. Remove the filter by hand and dump as much of the oil as possible into the drain pan. Mop the spilled oil off the front of the bike with rags. Remove the gloves.

    5

    Cut two pieces of standard oil line, with an inside diameter of 3/8-inch and an outside diameter of 5/8-inch, approximately 18 inches long with a sharp knife. The lines must be long enough to extend from the oil filter to the middle of the left down tube.

    6

    Slip one end of each of the two new oil lines onto the Jagg oil filter adapter nipples. Tighten the lines to the nipples with two of the hose clamps included with the adapter kit and a flat-head screwdriver.

    7

    Position the O-ring included with the kit on the oil filter adapter. Slide the oil filter adapter and O-ring onto the oil filter mounting stud.

    8

    Spin the adapter anchor nut onto the oil filter stud and tighten with a 1-inch hex socket, socket extension and socket wrench.

    9

    Spin the banjo fitting included with the kit onto the oil filter stud. Spin a new oil filter onto the oil filter stud and hand tighten.

    10

    Attach the 1/16-inch rubber shims and the 1-1/8-inch clamps included in the oil cooler kit to the left down tube. Attach the oil cooler to the clamps with its nipples down and the cooling fins facing forward, using the supplied nuts and bolts, hex socket and socket wrench.

    11

    Attach the two oil lines from the oil filter adapter to the two nipples on the bottom of the oil cooler using the hose clamps included with the oil cooler kit and a flat-head screwdriver.

    12

    Pour three quarts of oil into the oil tank. Start the engine in neutral and run for one minute.

    13

    Check for oil leaks while the bike is running. Turn off the engine and check the oil level in the oil tank with the dipstick. It should be about one quart low.

    14

    Add oil to the oil tank as needed. Restart the engine in neutral and run for at least five minutes. Check for leaks while the motorcycle is running. Make sure the oil cooler becomes warm.

Read More.. >

Wednesday, May 7, 2014

How to Remove Install the CV Half Shaft on a 2007 Ford F150

Changing the half shaft on a 2007 Ford F150 pickup is a moderately challenging job for the do-it-yourself mechanic. Steering and suspension parts such as the half shaft, are exposed to the elements, and endure many stresses during use. The accumulated wear can make parts stubborn to remove. Read the following instructions caully before attempting the repair, and make sure you have the necessary parts and equipment on hand.

Instructions

    1

    Place the vehicle in neutral and raise it with the floor jack. Place jack stands securely under the vehicle frame rails.

    2

    Remove the wheel whose half shaft is to be replaced.

    3

    Remove the dust cap in the center of the wheel hub using a screwdriver and rubber mallet. You can also use channel lock pliers large enough to grip it.

    4

    Remove the wheel end nut and discard it.

    5

    Remove the two vacuum lines at the integrated wheel end, where the axle bolts to the wheel hub.

    6

    Remove the three integrated wheel end bolts securing the half shaft to the wheel hub.

    7

    Remove and discard the tie rod end nut. Separate the tie rod from the knuckle using a ball joint separator.

    8

    Remove and discard the upper ball joint nut. Separate the upper ball joint from the knuckle using a ball joint separator.

    9

    Hold the half shaft in. Allow the wheel hub assembly to swing away caully until there is enough clearance to remove the outboard end of the half shaft from the hub bearing. Take care not to damage the hub seal.

    10

    Remove the integrated wheel end from the half shaft.

    11

    Remove the six bolts attaching the half shaft flange to the axle flange. Separate the half shaft from the axle and remove the half shaft from the vehicle.

    12

    Install the integrated wheel end to the outer CV joint housing on the new half shaft. Take care not to dislodge the seal spring when installing.

    13

    Installation is the reverse of removal, using the following torque specifications: half shaft flange to axle flange bolts, 60 foot-pounds; upper ball joint and tie rod nuts, 110 foot-pounds; integrated wheel end bolts, 9 foot-pounds; wheel end nut, 18 foot-pounds.

Read More.. >

Saturday, April 5, 2014

How to Install Weatherstripping on a Jeep Cherokee

How to Install Weatherstripping on a Jeep Cherokee

You can install weatherstripping on your Jeep Cherokee in your garage with a few supplies that can be purchased at an auto parts store. Replacing the weatherstripping on a Jeep Cherokee improves the seal formed between the door frame and the closed vehicle door. Weatherstripping prevents air and moisture from entering the Jeep and ruining the interior. You will know its time to install new weatherstripping when the old weatherstripping becomes cracked, loses its shape and wont seal the door properly.

Instructions

    1

    Find the clips that secure the weatherstripping to the Jeep. Remove them with needle-nose pliers. Place the clips in a cup and set aside.

    2

    Pull the old weatherstripping off of the Jeep with your hands. Each piece of weatherstripping will slide right off the door frame channel.

    3

    Wipe degrease agent with a rag onto the door frame weatherstripping channel. This will remove all the grease and dirt.

    4

    Slide new weatherstripping onto the channel on the door frame.

    5

    Reattach the clips to the weatherstripping, pushing them over the top of the stripping and attaching them to the Jeeps door frame. You will hear them snap into place when properly attached.

Read More.. >

Saturday, March 22, 2014

How to Install a Thermostat in a 2002 Grand Caravan

How to Install a Thermostat in a 2002 Grand Caravan

If the thermostat in the 2002 Dodge Grand Caravan malfunctions, the engine may not warm up properly and you may not be able to heat the cabin of the vehicle. This is annoying for the driver and passengers, especially if the thermostat fails in the winter. If the thermostat fails, replace the thermostat as quickly as possible to prevent extended use of the vehicle without proper engine heating.

Instructions

    1

    Drain two gallons of radiator fluid from the radiator via the petcock on the bottom of the radiator. You can reuse the fluid later so use a clean container.

    2

    Locate the thermostat by following the upper radiator hose from the radiator to the housing on the engine.

    3

    Pry the clamp off the hose with a pair of pliers. Pull the hose off the housing.

    4

    Remove the bolts that secure the housing to the Caravans engine with a socket and ratchet. Pull the housing off the engine.

    5

    Pull the thermostat out of the engine. Remove and discard the thermostat gasket.

    6

    Clean the surface of the thermostat housing and the engine with a clean towel.

    7

    Install the new gasket. Put the new thermostat into the hole.

    8

    Place the thermostat housing on top of the gasket. Thread the bolts into the housing with your fingers. Tighten the bolts with the socket and ratchet.

    9

    Slide the hose onto the housing. Secure the hose with the clamp.

    10

    Pour the radiator fluid back into the radiator.

Read More.. >

Friday, March 21, 2014

How to Install an Electric Fuel Pump in a 1997 Ford 7 3

A 1997 Ford vehicle may have a variety of engine sizes, including an 8-cylinder 7.3-liter diesel engine. This engine is in the larger pickup trucks, such as a F-250 or F-350. The 1997 Ford 7.3-liter engine uses fuel injection and requires a high-pressure electric fuel pump. The fuel pump in a Ford diesel engine is accessible from the engine compartment and its replacement requires you to first relieve the pressure in the fuel system.

Instructions

    1

    Disconnect both ground cables from the battery with a socket wrench to prevent accidental sparking from the battery. Loosen the filler cap for the fuel tank by 1/2 turn to relieve the pressure in the fuel tank. Open the filler cap completely.

    2

    Raise the vehicle with a floor jack and support it on jack stands. Locate the electrical connector for the fuel pump in the engine compartment. It is behind the fuel pump and next to the frame rail. Detach the electrical connector from the fuel pump.

    3

    Locate the retaining clip for the fuel line to the fuel pump. Slide the retaining clip off of the quick connect fitting for the fuel line. Remove the fuel pumps fuel line from the fuel pump with the fuel line tool.

    4

    Remove the clips for the brake line from the bracket of the fuel pump. Disconnect the pinch bolt on the mounting bracket with a socket wrench and spread the bracket open. Detach the fuel pump from its mounting bracket.

    5

    Install the new fuel pump by performing steps one through four in reverse order. Start the engine and check for fuel leaks.

Read More.. >

Thursday, March 20, 2014

How to Install a Timing Belt on a 2002 KIA Rio Cinco

The Kia Rio is a subcompact car that Kia Motors has produced since 2001. The Cinco trim level of the Rio is a five-door hatchback available in the United States. The procedure for installing the timing belt depends only on the engine and is not directly affected by the trim level. The 2002 Kia Rio Cinco has a four-cylinder, 1.5-liter engine that uses a timing belt to synchronize the movements of the camshaft and crankshaft.

Instructions

    1

    Remove the cable from the negative terminal of the battery with a socket wrench. Detach the accessory drive belts from their respective pulleys. Disconnect the alternator and water pump.

    2

    Disconnect the crankshaft pulley with a socket wrench and remove the guide plate from the timing belt pulley. Disconnect the upper and lower covers for the timing belt.

    3

    Turn the crankshaft pulley clockwise to align the timing mark on the pulley with the timing mark on the engine. The I and E marks on the camshaft pulley must also align with their respective marks on the cylinder head. Disconnect the timing belt tensioner pulley and the timing belt with a socket wrench.

    4

    Connect the pulley for the timing belt tensioner. Pull the tensioner away from the crankshaft pulley as far as possible and fasten the lock bolt for the tensioner to hold it in place. Place the timing belt onto the crankshaft pulley, idler pulley, exhaust camshaft pulley, intake camshaft pulley and tensioner pulley, in that order.

    5

    Loosen the pulley for the timing belt tensioner to apply tension to the timing belt. Tighten the lock bolt to between 28 and 38 foot-pounds with a torque wrench. Turn the crankshaft clockwise by two full turns and align the timing marks.

    6

    Install the upper and lower covers for the timing belt with a socket wrench. Tighten the mounting bolt for the crankshaft pulley to between 9 and 13 foot-pounds with a torque wrench. Connect the water pump pulley and tighten its mounting bolt to between 9 and 13 foot-pounds.

    7

    Install the alternator and attach the accessory drive belts. Connect the cable to the negative terminal of the battery.

Read More.. >

Tuesday, March 11, 2014

How to Install Vance Hines Exhaust on a Harley Davidson Rocker

How to Install Vance & Hines Exhaust on a Harley Davidson Rocker

The Rocker is Harley-Davidsons custom chopper. With its solo seat, fat rear tire and kicked-out front end, it looks like it has been stripped down for speed. It actually weighs about 700 lb., however, and the engine produces only about 63 horsepower. Vance & Hines is one of several aftermarket exhausts. The Vance & Hines exhaust should boost your Rockers horsepower above 70.

Instructions

    1

    Cover all finished areas on the right side of the motorcycle with rags to protect your paint and chrome. Remove the right foot peg and brake pedal with a socket wrench. Loosen all of the fasteners that connect your exhaust manifold and exhaust support bracket with a socket wrench or box wrenches. Disconnect the two oxygen sensors with a wrench. You will reinstall these sensors with your new exhaust.

    2

    Loosen all remaining fasteners holding the exhaust on by hand. Remove the old exhaust. Remove and replace the exhaust manifold gaskets. Using a small screwdriver or snap ring pliers, remove and set aside the clamps and retainer rings. You will use them on your new exhaust.

    3

    Install all of the hose clamps that will support the heat shields. They must remain loose. If you tighten the hose clamps at this point, you risk warping your exhaust.

    4

    Use a wrench and thread locker to bolt on the new exhaust mounting bracket that came with your Vance & Hines pipes.

    5

    Reinstall your retainer rings and clamps in your new exhaust. Loosely bolt your new exhaust to your exhaust manifold and exhaust support bracket. Put Teflon paste on the oxygen sensors and reinstall them in your new header pipes.

    6

    Tighten the bolts that attach your new exhaust to the exhaust headers and support bracket using a wrench. Attach your heat shields to the hose clamps with a flat-head screwdriver.

Read More.. >

Monday, March 10, 2014

How to Install a Headlight on a 2007 Caliber

How to Install a Headlight on a 2007 Caliber

There are some vehicles that are somewhat easy to replace headlights on. Unfortunately, the 2007 Dodge Caliber (and many other Dodge vehicles) is not one of them. The owners manual of the vehicle will inform the owner to bring the car to the dealership for service when a headlight burns out. However, this is not always convenient and is rather costly. Replacing the headlight as a do-it-yourself project is possible, but its going to require a degree of mechanical skill.

Instructions

    1

    Apply the parking brake securely on the 2007 Dodge Caliber with the headlight switch and engine off.

    2

    Lift one front corner of the car with a jack and then lower the jack down onto a jack stand placed under the front frame. Repeat this step for the other front corner to elevate the front axle of the car.

    3

    Turn the ignition key one turn to unlock the steering wheel, and turn the wheel inward away from the respective fender (the drivers side headlight would require turning the wheel all the way to the right and the passenger side headlight would require turning the wheel all the way to the left). Turn the ignition key back to the off position.

    4

    Loosen the screws of the front splash shield/wheel well with the screwdriver. If necessary to reach behind the wheel well, remove a couple of the screws. The wheel well is plastic and somewhat pliable and manageable.

    5

    Shine a flashlight in through the wheel well to locate the headlight electrical connection. The inboard connector is the headlight, while the outboard connector is the parking and directional bulb connector on whichever side (drivers or passenger) the headlight is being replaced.

    6

    Disconnect the electrical connector plug from the socket base of the headlight.

    7

    Turn the socket base of the bulb counterclockwise a quarter turn. Remove the headlight from the lens assembly and extract it through the opening in the wheel well.

    8

    Put on a pair of latex gloves before handling the H13 automotive replacement bulb. Skin oil will compromise the glass bulb of the headlight due to the intense heat it burns at when lit.

    9

    Insert the replacement bulb through the loosened wheel well splash guard and insert it into the lens assembly. Aligning the socket base tabs with the notches in the back of the lens assembly will be required. Use the flashlight to help locate the correct alignment. Turn the socket base of the headlight a quarter turn clockwise to lock it into place and reconnect the electrical connector to the back of the headlight socket base.

    10

    Test the headlight (both low and high beams) before tightening the wheel well screws and lowering the Caliber.

Read More.. >

Saturday, March 1, 2014

How to Install Jdm Fog Lights on a 94 Civic

How to Install Jdm Fog Lights on a 94 Civic

Fog lights are a second set of headlights set low in the front bumper of a car to improve sight-lines during difficult driving conditions. The 1994 Honda Civic came with these useful lights standard. In addition to fog, these powerful lights help cut through rain, snow and sleet as well. If you want to replace or upgrade your Civics fog lights to JDM lights all youll need are some simple tools and about a half an hour.

Instructions

    1

    Park the vehicle on a level surface that is away from traffic and well lit. Turn off the engine and set the emergency brake. Allow the vehicle to sit for 20 to 30 minutes or until the hood is completely cool to the touch.

    2

    Crawl under the front end on the drivers side. Locate the fog light attached in the rear of the bumper. Notice the wire plugged into the fog light socket, which is called the wiring harness. Squeeze the sides of the plug with your fingers and then pull it straight out.

    3

    Locate and remove the mounting bolts holding the light assembly to the bumper. A simple adjustable wrench will do this job. Then slide out the old fog light assembly.

    4

    Slide in the JDM fog light assembly and secure it in the bumper with the same mounting bolts. Plug the wiring harness into the new socket. Repeat this process for the passengers side fog light and you will have completed the upgrade to JDM fog lights.

Read More.. >

Saturday, February 15, 2014

How to Install a Civic EK Sway Bar

How to Install a Civic EK Sway Bar

Its recommended that you have a sway bar on your Honda Civic EK while driving to prevent any damage to your suspension system. The car comes with one pre-installed, but you may choose to remove it and install a different model. You may also need to install a new bar if the old one is damaged in some way or has been removed for any reason.

Instructions

    1

    Jack up the car to allow you easy access underneath. Be sure to use jack stands for safety reasons.

    2

    Align the sway bar so the ends are on the designated posts and can be bolted down easily. The posts should fit into the pre-existing holes on the sway bar. The bar should be attached where the old one was removed, running parallel to the axel of the car, front or back, next to the suspension. If youre unsure of the location, consult your car manual.

    3

    Attach the sway bar to the frame of the car using the brackets to hold it in place. Tighten the bolts to the bracket.

    4

    Tighten the bolts on the ends of the sway bar to secure it further.

Read More.. >

Thursday, February 13, 2014

How to Install a Cylinder Head on a BMW E28

How to Install a Cylinder Head on a BMW E28

The BMW E28 is one of the companys 5-Series line of cars. It was manufactured between 1981 and 1988, and came standard with a 24 valve cylinder head engine known as the S38. Like all vehicles, the E28 requires regular maintenance. If you find that one or more of your cylinder heads are beginning to wear out, it is advisable to replace them with new ones. If you dont like spending hundreds of dollars on a mechanics labor costs, it is possible to change the head yourself.

Instructions

    1

    Unscrew the exhaust pipes and remove them from the exhaust manifold.

    2

    Unscrew the coolant plug and drain the fluid into your oil pan.

    3

    Disconnect the throttle and cruise control cables.

    4

    Unscrew the vacuum hose and remove it from the air cleaner along with the sensor.

    5

    Disconnect the diagnosis and radiator hoses and remove the fuel lines.

    6

    Pull off the plugs on the fuel connectors and disconnect the ignition coil.

    7

    Disconnect the vent hose.

    8

    Remove the nuts from the cylinder head cover with your wrench and set them aside. Remove the cylinder head cover.

    9

    Remove the 14 exposed bolts of the cylinder head, moving from the middle of the head outward.

    10

    Remove and replace the cylinder head.

    11

    Replace the cylinder head bolts, cylinder head cover, vent hose, ignition coil, fuel lines, diagnosis and radiator hoses, air cleaner sensor, vacuum hoses, throttle and cruise control cables, coolant plug, and exhaust pipes in the reverse order that you removed them. Refill your coolant reservoir with the fluid in your oil pan to complete the process.

Read More.. >

Thursday, February 6, 2014

How to Install a Brake Controller in an 03 Dodge Ram

A Dodge Ram is a full-size pickup truck that Chrysler has manufactured under its Dodge brand since 1981. The 2003 model belongs to the third generation of this series, which was in production from 2002 to 2008. The anti-lock braking system in a 2003 Dodge Ram has a brake controller known as a hydraulic control unit, or HCU. The HCU prevents the wheels from locking during an emergency stop by reducing the braking power to a wheel when it rotates more slowly than the other wheels.

Instructions

    1

    Disconnect the housing for the left front turn signal with a socket wrench and remove the extension panel under the housing. Detach the electrical connector for the horn and disconnect the horns access cover.

    2

    Disconnect the mounting screws for the windshield washer reservoir and pull the reservoir up. Detach the electrical connector and hose from the windshield washer pump. Disconnect the reservoir and remove it from the engine compartment.

    3

    Remove the cables from the battery with a socket wrench and disconnect the power distribution center in the engine compartment. Push the connectors for the electrical wiring harness together to detach it from the controller anti-lock brakes. Disconnect the brake lines from the HCU.

    4

    Disconnect the front mounting bolt for the HCU bracket through the access opening with a socket wrench. Disconnect the rear mounting bolt for the HCU bracket from the engine compartment. Pull the HCU assembly up slightly and detach it from its bracket.

    5

    Place the new HCU in its mounting bracket, and install the HCU assembly. Tighten the mounting bolts for the HCU bracket to 11 foot-pounds with a torque wrench. Connect the brake lines to the HCU and tighten its retaining nuts 115 inch-pounds. Attach the wiring harness for the controller anti-lock brakes and lock the connectors into place.

    6

    Install the reservoir for the windshield washer. Connect the motor and hose for the windshield washer pump. Fasten the mounting screws for the reservoir with a socket wrench.

    7

    Attach the battery cables and the power distribution center. Connect the electrical connector for the horn, and replace the horns access cover. Fasten the extension panel and housing for the left front turn signal.

Read More.. >

Tuesday, January 28, 2014

How to Install the Oil Sending Unit in a 2001 Mercury Sable

Mercurys 2001 Sable uses an oil pressure sending unit mounted in an oil galley in the engine block to detect oil pressure within the engine. The sending unit in the 3.0-liter engine is a normally-closed switch that completes the low oil pressure warning lamp circuit to ground and illuminating the lamp when there is insufficient oil pressure. When oil pressure within the galley reaches the specified pressure, the switch opens and interrupts the low oil pressure lamp ground circuit, turning the lamp off. Illumination of the low oil pressure lamp can indicate a bad sending unit, bad connection at the sending unit wire, or a more serious condition within the engine that is lowering the oil pressure.

Instructions

Overhead Valve 3.0-Liter Engine

    1

    Locate the oil sending unit on the rear left side of the engine block above the flywheel. Disconnect the oil sending unit electrical connector.

    2

    Remove the oil sending unit, using a ratchet and socket.

    3

    Wrap the threads on the new oil sending unit with Teflon tape, or equivalent electrically conductive sealer. Make certain the tape does not cover the end of the oil sending units sensor that penetrates the engine oil galley.

    4

    Thread the new oil sending unit into the engine block. Tighten the sensor to 14 foot-pounds, using a foot-pound torque wrench and socket. Connect the oil sending unit electrical connector.

    5

    Start the engine. Make certain the low oil pressure warning lamp on the dash instrument cluster goes off after the engine starts. Allow the engine to reach normal operating temperature and check the sending unit for leaks.

Dual Overhead Cam 3.0-Liter Engine

    6

    Park the vehicle on firm, level ground. Engage the parking brake. Raise the vehicle using a jack and support it on jack stands. Chock the rear wheels.

    7

    Locate the oil sending unit on the left side of the engine above the oil filter. Disconnect the oil sending unit electrical connector.

    8

    Hold the adapter pipe in the engine block in place using an open-end wrench. Remove the oil sending unit from the adapter pipe, using a ratchet and socket.

    9

    Wrap the threads on the new oil sending unit with Teflon tape, or equivalent electrically conductive sealer. Make certain the tape does not cover the end of the oil sending units sensor that penetrates the engine oil galley.

    10

    Thread the new oil sending unit into the adapter pipe. While holding the adapter pipe in place with the wrench, tighten the oil sending unit to 10 foot-pounds, using a foot-pound torque wrench and socket.

    11

    Connect the oil sending unit electrical connector.

    12

    Raise the Sable with the jack, and then remove jack stands. Lower the vehicle to the ground.

    13

    Start the engine. Make certain the low oil pressure warning lamp on the dash instrument cluster goes off after the engine starts. Allow the engine to reach normal operating temperature and check the sending unit for leaks.

Read More.. >

Friday, December 20, 2013

How to Install the Auto Volt Gauge Wire

How to Install the Auto Volt Gauge Wire

A volt gauge for an automobile measures the voltage in your vehicless electrical system. It typically functions only while the ignition is on, and an auto volt gauge may include a warning light for when the voltage is outside the normal operating range. You must mount an auto volt gauge where you can see it while driving, usually under the dashboard. The kit for an auto volt gauge contains mounting hardware specific to that volt gauge.

Instructions

    1

    Find a fuse in your vehicles fuse box that does not receive any current unless your vehicles ignition is on. Common choices include the fuse for your stereo system or your power windows. Pull this fuse from its socket.

    2

    Attach the mount for the volt gauge in a convenient location, according to the instructions. This will typically require you to drill holes in the dashboard with a drill, and fasten the volt gauge mount with screws.

    3

    Cut two lengths of 14-gauge electrical wire that are several feet long. Strip inch of the insulation from one end of each wire. Connect the bare end of one of these wires to the positive terminal of the voltage gauge with electrical tape. Connect the bare end of the other wire to the negative terminal of the voltage gauge with electrical wire. Attach the volt gauge to its mount according to the instructions.

    4

    Route the free end of the negative wire to a grounded screw on the dashboard. Cut off the excess wire and strip the insulation from the last half inch of the wire. Loosen the grounded screw, wrap the wire around it and tighten the screw.

    5

    Route the free end of the positive wire to the fuse box. Cut off the excess wire and strip inch of the insulation from the end of the wire. Push the bare end of the positive wire into the empty fuse socket and replace the fuse. Secure the end of the positive wire with electrical tape.

Read More.. >

Wednesday, December 4, 2013

How to Install a Gibson Exhaust

Gibson exhausts are bolt-on cat-back exhaust systems made primarily for trucks. However, Gibson does have design models for cars, motor homes, and SUVs. A cat-back exhaust system is the section of exhaust that runs from the catalytic converter to the muffler. The systems available from Gibson are of the bolt-on type, so youll only have to worry about replacing the exhaust tubing and not the delicate emissions control portion of the exhaust (the converter). Once the old exhaust system is off, install the new Gibson exhaust.

Instructions

    1

    Climb under the vehicle and place the exhaust on top of 4 jack stands spaced evenly underneath the vehicle. The point of this procedure is to try to get the exhaust off the ground so that you can align the exhaust tubing with the mounting holes on the catalytic converter.

    2

    Align the mounting holes on the exhaust with the mounting holes on the catalytic converter.

    3

    Place an exhaust gasket between the converter and the Gibson exhaust piping. You can set it against the mating surface of the catalytic converter.

    4

    Press the exhaust piping to the catalytic converter and thread the Gibson exhaust to catalytic converter bolts.

    5

    Tighten the exhaust bolts.

    6

    Slide the exhaust piping hangers onto the exhaust hangers on the underside of the vehicle.

    7

    Thread the O2 sensor into the Gibson exhaust. There is only one port for the O2 sensor.

    8

    Connect the electrical wiring running to the O2 sensor.

Read More.. >

Monday, November 25, 2013

How to Install Yamaha Raider Saddlebags

How to Install Yamaha Raider Saddlebags

With its low profile and kicked-out front end, the Yamaha Raider intentionally emulates the look of high-end custom Harleys. It is an homage to new millennium bar hoppers. Yamaha calls it "chopper inspired." Choppers and bobbers usually dont have bags but Yamaha will sell you a pair anyway. Dozens of other motorcycle aftermarket companies will too. And if you take your Raider for a trip, they are likely to come in handy. This is how Hardstreet Slimbags bolt onto your Raider.

Instructions

    1

    Identify the pistol-shaped fender rail on both sides of your rear fender. Work on one side at a time. Remove the two rear bolts from one fender rail with a ratchet. Unpack the saddlebags and identify the left and right saddlebags. Attach the right saddlebag first. Unpack the mounting brackets and identify the brackets, bolts, spacers, washers and screws. You should have four of each. Read the instructions included with the brackets.

    2

    Use two short screws and two long bolts to attach two brackets to the right saddle bag.

    3

    Use two spacers and your original fender rail bolts to attach the right saddlebag to the right fender rail with a box wrench.

    4

    Repeat with the left saddlebag.

Read More.. >